FIXED COST OPTIMIZATION OF
WATER EXTRACTION AND REUSE

We design and install rapid bulk material stockpile de-watering systems that are powered by gravity. 
MEGA-Drain™ recovers process water in mere hours and makes it available for re-use with quantifiable ROI.

Sample mining solution matrix 

Cyclone application

Cyclone

underflow

slurry

Overflow slurry

water

return

water

return

water

input

Dewatering cyclone underflow and overflow stockpiles

23% Moisture

Misc. Tailings

Silt capture within

filtration tubes

Replaces presses and optimizes dam stability

What we enable

Significantly reduced OPEX
Rapid dewatering to sub 5%
Increased EBIDA
Increased production by 20-35%
Efficient water recycling 
Environmental compliance 
Reduced tailings dam footprints
Safer tailing stockpiling

What we eliminate

Presses and dryers
Budget uncertainties
Excessive water & power demand
Material rehandling

Other offerings

Accelerated evaporation tech if needed
Water treatment flocculent systems

Other mining sample use cases

Tripper Tunnel Dewatering.png

Tripper tunnels

Belt reclaimers

Radial stackers

Radial Stacker Dewatering.png

Operational Gains

Sprint capacity is increased, requiring less land and infrastructure for product processing. This system is highly resistant to cold weather and allows for extended production throughout winter seasons.

Unparalleled Dewatering System Access

Serviceability is crucial in drainage technologies. Our design features hatch access for cleaning and inspection, and the vaulted design allows for both flushing and vacuuming, making it unparalleled in this application.

Fuel cost intensive drying is replaced with gravity siphon tech powered by gravity

Vac truck.jpg

Vacuum truck accessing MEGA-Drain™ service port

Durability

Our system features a proprietary structural geocellular vault that provides engineered crush resistance to both product and vehicle loading. It is the only system to guarantee live load, dead load, and system creep. Product testing ranges between -85° F and 140° F (-65°C and 60°C).

Operating over MEGA-Drain™ sysytem

A sampling of equipment that is operable over our system includes:

Loaders: 980, 982, 988, 992 and 995 Caterpillar and equivalents:

Dozers: Any dozers up to CAT D11 and equivalent

Articulated Trucks:  Komatsu HM 300-5, HM 400-5, and equivalents

Excavators: Any excavator size up to 395 Caterpillar and equivalents.

GPS Layer Protection 00.png

Our system ingrates GPS controls to avoid direct equipment contact with drain layer

All drainage components are made in the USA with ISO manufacturer certification.

Qualified Design Team

MEGA-Drain™ has proven systems installations with 4 million ton per year operations. Our team of design and support professionals are represented by: Structural/design engineers, Manufacturer product/product quality assurance engineers, CPSEC environmental experts, hydrologists and geologists, A SR/WA Senior Right of Way Professional, Certified geomembrane application experts All designs are modeled with Pass/Fail reports for operations with engineering sign offs.

Deliverables

The full scope of work will be delivered and presented as processes and procedures with a construction schedule. All required product submittals and material certifications are delivered/accepted in advance of construction. All materials are delivered and verified on-site prior to construction commencement. As-built CAD Drawings and geosynthetic field quality control testing documentation. Operation & Maintenance plan with site specific SOPs. Training onsite of equipment and full system; includes field training with operators and office management. Night shift and day shift monitoring with staff geologist and technical team as O&M implementation advances. System installation warranty.

Radial Stacker 03 with MEGA-Drain.jpg

Turnkey installation services

On-site project management. Brownfield Projects: Installation of systems will work within the daily production activities. Greenfield Projects: Daily/weekly involvement with project managers, client engineers, submittals, CAD as-built design adjustments as necessary for design-build. Installation is performed by MSHA and OSHA Certified geomembrane/geosynthetic installers.

On-Going Support

Option to purchase scheduled inspections and cleaning of the system by MEGA-Drain.

MEGA-Drain™ is the only drain system with an engineered process and procedure for repairs and has the manufacturer inspect the repair to ensure warrantability.

MEGA-Drain™ has replacement materials in stock and can dispatch repair technicians both domestically and internationally.

MEGA-Drain Under Cyclones.jpg

MEGA-Drain™ Cost

We provide four dewatering system type options to fit most budgets. With an executed NDA in place, we will calculate: 1.Client’s site-specific installed cost Per square foot/meter, return on investment (ROI), calculated decant volumes, and sprint capacity forecast. 2.Client's percent (%) thru-put increase in production and possible existing deficiency from nameplate, as relates to rotary drier usage. 3.Calculate Natural Gas savings applicable to tonnage via rotary driers. The ongoing MEGA-Drain™ savings can act as a long-haul hedge against the ever-increasing plant operation expenses.